The objective of the project was to develop an innovative and safe installation and logistics concept. Therefore, new transport and lifting concepts for wind turbine components of 6-MW turbines at the North Sea were developed in order to face conditions of a significant wave height of 2.0 m. The results were demonstrated on a real offshore site. The research objectives within these
project included a significant improvement of the present logistics concepts as well as the development of basics and technologies for the future use of feeder vessel concepts.
Contact persons:
J. Ohlendorf
(Project manager)
A. Ait Alla
N. Hoppe
S. Oelker
Funded by:
BMWi
Duration:
01.09.2015 - 31.12.2019
See project's publications